Built for the crews that bore, pull and place underground.
The same drilling crews and equipment install fiber, power, water and gas. Three Strand Build started in fiber construction, and its reel and footage tracking works today for any contractor pulling conduit and cable. Support for pipe and utility-specific field work is on the way.
Where underground crews work
Water and sewer
Service lines, mains and crossings bored under roads and driveways.
Gas
Service and distribution lines, where locates and potholing matter most.
Power
Duct banks and cable runs for distribution and underground service.
EV charging
Conduit and power runs to chargers under parking lots and sidewalks.
Data centers
Large power and fiber duct banks on campus and backbone builds.
Civil and residential
Road and site crossings, and utility services lot by lot in new subdivisions.
Reel and footage control
- Conduit and cable reels tracked by footage, from receiving to the ground
- Reels checked out to bore and pull crews, with each reel's reading confirmed
- Daily pulls recorded by crew leads on a phone, in English or Spanish
- Off-project use and footage gaps flagged to the office, never blocked
- Crew days approved by the construction manager, with notes and photos
- Transfers between yards, holds for upcoming jobs, and running-low alerts
Utility-specific field work
- HDPE pipe coils and power cable, including product with no printed footage marksComing soon
- Utility color codes and pipe types (water, gas, power, telecom) as your own listsComing soon
- Rod-by-rod bore logs with depth, pitch and offset, in 3SB CaptureComing soon
- Utility work items: valves, meter pits, service taps, potholes and restorationComing soon
- Frac-out and inadvertent-return reporting, in 3SB SafetyComing soon
Run HDD or utility crews?